Dubai Municipality says it treated 350 tonnes of waste water contaminated with COVID-19 from the start of the pandemic until the end of April.
The civic body has been taking waste from medical facilities and transporting it directly to the treatment plant for hazardous waste in Jebel Ali.
It transported five to six tonnes of waste every day during the said period, with the facility receiving it around the clock in three shifts per day.
Officials say the contaminated waste is sterilised immediately upon arrival at the plant, as are all equipment and vehicles used.


UAE successfully intercepts 15 ballistic missiles, 119 drones
flydubai resumes operations in and out of Dubai
Emirates resumes DXB operations after brief suspension
Indian education board CBSE postpones Class 12 exams
Dubai International Airport partially resumes operations
